BGES Department Office Has Moved to 100 Davenport!

On December 18, 2017, the Department front office moved to 100 Davenport. This is the first step in many to come in preparation for Phase II of the Holt Renovation. Phase II will not officially start until Summer 2018. Below are the new office locations of our faculty and staff. Come on over and check it out!

100 Davenport: Dr. John Tucker
100 Davenport: Marketa Shutters
105 Davenport: Dr. Cheryl Murphy
108 Davenport: Kelly Locke
109 Davenport: Joseph McCauley
 

During Spring 2018, the East Side of Holt Hall will still hold classes and house several of our faculty. Make sure to come to your classes scheduled for Holt Hall.
 

 

We've Outgrown Our Space!

Dramatic increases in BGE students and faculty during recent years indicate healthy academic programs, but present numerous challenges. We’ve outgrown our space in Holt Hall, and for several years offices and labs have spilled over into Grote Hall and the 5th Street Annex. The good news is that Holt Hall renovation is planned to begin in 2017, and after the renovation BGE will occupy the entire building. BGE space in Holt Hall will double, accommodating the majority of BGE faculty offices and labs. Geology faculty offices and labs will remain in Grote Hall.

Holt Hall will be renovated in two phases. Phase I involves renovating the West half of the building (near UTC Student Center). During summer 2016, BGE faculty and labs in the West half of Holt Hall were relocated to other buildings, in preparation for renovation. Relocated faculty offices and labs are listed below. After Phase I is completed, the West half will be reoccupied. The BGE front office will remain in Holt Hall 215 during Phase I.

During Phase II, faculty offices and labs in the East half of Holt Hall will be relocated and that half will be renovated. The renovation process is complex and will necessarily involve some inconvenience for faculty and students. BGE appreciates your cooperation and understanding during the renovation period.